














AeroTrace Nano Vehicle GPS Tracker With Real Time Location And Magnetic Mount
Introduction
AeroTrace Nano Vehicle GPS Tracker With Real Time Location And Magnetic Mount is a compact, magnet-mounted GPS tracker designed to help you locate your car in real time and deter theft. Ideal for vehicle owners who want discreet, reliable location data, it offers global visibility without ongoing membership fees after setup.
Features
- Compact, discreet design — size 42 × 25 × 20 mm, weight 50 g, color black in ABS housing.
- Built-in magnet with waterproof option — quick, tool-free mounting on or inside your vehicle.
- 4G connectivity with 2G fallback — ensures location data is available where networks exist.
- GPS positioning via satellites — accurate location data independent of cell towers.
- Real-time tracking — live location updates accessible from your smartphone.
- Long battery life — up to 180 days of standby operation on a single charge.
- No ongoing service fees — activation requires a 4G SIM card; after setup there are no recurring costs.
- Global usability — works anywhere there is cellular signal, at home or abroad.
- Alarm features — SOS alarm and mobile alarm for quick alerts.
- Optional recording capability — expansion card support for additional functions if needed.
- Specifications at a glance — GPS accuracy 10–50 yards; lithium battery; operating voltage 3.4–4.2 V; charging input 110–220 V AC, 50/60 Hz; network GSM/GPRS; size 42 × 25 × 20 mm; weight 50 g.
Benefits
With the AeroTrace Nano, you can quickly locate your vehicle in real time, increasing the chances of a swift recovery if stolen and reducing worry on the go. The discreet magnetic mount lets you place the tracker where it’s least visible, while satellite-based GPS delivers reliable positioning independent of cell towers. The device is designed for long-term use with up to 180 days of standby power and requires no ongoing fees after activation, making global tracking simple, affordable, and dependable.
Válasszon opciókat